huntebrücke oldenburg sorted by
relevance

Admin17.08.2021

A 29: Huntebrücke

It connects the city of to and the , running very roughly from north to south.
Admin25.08.2021

Blick auf die Huntebrücke

28 meters from to support and a clear width of 52.
3207
Admin10.07.2021

A 29 in Oldenburg: Huntebrücke

Friederike Kloth: , Nordwest-Zeitung, May 8, 2010.
3203
Admin01.07.2021

Top 20 Bike Rides and Cycling Routes around Hunte / Hafen Oldenburg

Passenger traffic was never particularly brisk; Both the 1914 summer timetable and the 1939 summer timetable show five continuous passenger trains.
6006
Admin13.08.2021

Oldenburg

Maintenance and operation of the line repeatedly caused great difficulties.
3200
Admin25.06.2021

Neue Huntebrücke soll 2026 fertig sein

To the north of this, the route is interrupted by a missing bridge over the A29.
9409
Admin06.07.2021

Neue Huntebrücke soll 2026 fertig sein

Behind it, the nature reserve Bornhorster Huntewiesen and the Moorhauser Polder spread out.
2408
Admin31.07.2021

Bundesautobahn 28

53 meters in the second lifting stage each based on mTHW.
2204
Admin13.07.2021

Top 20 Bike Rides and Cycling Routes around Hunte / Hafen Oldenburg

Before the bridge was opened, which was done from a control stand on the bridge superstructure, the barriers on both sides in front of the bridge were closed and the bridge was closed to road traffic.
6604